2.1 – EPC update

22-1-2015

EPG

      The calculation for EPC-NL is changed according to NEN 7120 corrections C4 and C5, and NEN 8088-1 corrections C2 and C3.

      The EPC validation is changed according to new building regulations January 1st 2015.

      The calculation of an adjacent veranda is changed.

      The calculation of the heat losses to the ground is changed.

      The EPCheck connection is updated to EPCheck version 3.2.

      The interface to check out an energy label is changed according to monitoring file version 5.1.

Building Simulation

      In “location” specific days can be set up, so that extra output data of those days will be shown in the reports.

BIM Connect

      The IFC import checks for double, identic spaces. If identic spaces are recognized, only one space will be imported.

Service updates

      A solution has been added so that auto save, undo, and redo work more consistent when editing the project (such as drawing).

      The description of error messages are more clear.